400 kV OHL Mintia - Arad

The 400 kV Mintia Arad OHL has a total length of 134.6 km (markers 1-402) belonging to CN Transelectrica – ST Timișoara.

The line is single circuit on the 11-401 section and double circuit on the 1-11 and 401-402 sections.

The works required to build the new 400 kV single-circuit OHL sector consisted of:

  • Handover and acceptance of the OHL tower sites
  • Drawing up the execution schedule
  • Construction of the access roads
  • Foundation works
  • Execution of the boreholes
  • Dismantling and reinstallation of the active and earth conductors
  • Dismantling of the suspension insulator strings
  • Equipping the new towers with triple tension insulator strings made of composite material
  • Restoration of the optical fibre network
  • Installation of the earthing electrodes for frequent traffic at the newly mounted towers