Sarichioi wind farm

Connection to the National Power Grid of the Sarichioi Wind Power Plants - Tulcea

The project consisted of building a 15 km overhead power line (OHL) between the electrical substation of the Sarichioi wind farm and the connection point to the National Power Grid, located along the route of the 110 kV overhead line between Zebil and Tulcea Vest, and building the 110/33 kV electrical substation, which was connected to the 110 kV Zebil - Tulcea Vest OHL through an overhead connection.

Total installed capacity: 30 MW

Connection substation - Zebil Nord 110 kV

12 km 110 kV OHL

12 km OPGW

Connection to the Power Transmission and Distribution Grid